Latest
issue
GET HCM
magazine
Sign up for the FREE digital edition of HCM magazine and also get the HCM ezine and breaking news email alerts.
Not right now, thanksclose this window I've already subscribed!
Elevate
Elevate
Elevate
Follow Health Club Management on Twitter Like Health Club Management on Facebook Join the discussion with Health Club Management on LinkedIn Follow Health Club Management on Instagram
FITNESS, HEALTH, WELLNESS

features

Promotional Feature: Site investigation

For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost. Denis O’Brien, senior surveyor from international construction services company ISG – a key Alliance Leisure contractor – explains the basics of the process

Published in Health Club Management 2014 issue 1

For potential leisure projects, how important are the site investigations in the Alliance design and build process?
Site investigations may not be the most exciting part of the process to talk about, but without very detailed and rigorous surveys at this key stage, it’s impossible to come up with a realistic project cost. Alliance Leisure always works to a fixed price contract, so we need to know about every potential pitfall of the proposed development site.

What’s involved?
It depends whether we’re looking at a new build or an extension to an existing facility. There are obviously a lot more unknowns – particularly relating to the ground works – with a site that doesn’t already have a building on it.

We undertake ground investigation surveys, tree surveys, environmental impact surveys, assess the proximity and ease of access to utilities. We also try to look for the potential show-stoppers such as former coal mines or sink holes. Of course, there are always some things you can’t plan for which might significantly delay the start of the project, such as undiscovered munitions or archaeological remains, but in reality these are very rare occurrences.

When it comes to extensions and redevelopments, there’s another whole tier of investigations to carry out before the project can be accurately costed.

The majority of leisure centres we’re now redeveloping date back to the 60s and 70s, so we have to consider the presence of asbestos and the quality of the drains, as well as undertaking structural surveys to see if the existing structure can take the new load.

We also need to check whether the existing services provision is sufficient to supply a larger site, and carry out a dilapidation survey to check structures such as the original roof, which might be nearing the end of its life.

What are the site problems that add most to the budget?
If there are inadequate services, then the need, for example, to build a sub-station could easily add £100,000–£120,000 to the project cost.

With existing leisure centres, it might be that it’s best to knock down a quarter to a third of the existing building in order to properly develop the site.

However, in the case of older buildings, it’s almost always better to plan to replace some elements of the building right at the start, as the payback on this can be relatively quick. For example, we’ll always introduce modern, efficient lighting to any building project we’re working on from top to bottom, as the energy savings this yields over time can enable the leisure centre to recoup the cost of the capital outlay in just a few years.

It’s a false economy to cut elements like this out of the budget just to bring proposed costs down.

How do the site findings feed into the overall process?
On the basis of these investigations, we’re able to carry out a block planning exercise that comes up with the overall size and shape of the development, together with the content and what it will cost (usually within 10–15 per cent of the final fixed cost).

If there are any real show-stoppers at this stage, which is very rare, the client can choose to walk away and just bear the cost of the site investigations.

Sometimes, at this stage, the local authority might want to scale down some elements of the project to make savings.

If they proceed with the plan, the site investigation costs are absorbed into Alliance’s overall development costs. We then go on to commission architects, and draw up a more robust cost plan and a bill of quantities.

CASE STUDY

Jade Jones Pavilion Flint, North Wales

In July 2012, Alliance Leisure completed a £2m extension and refurbishment project at the Jade Jones Pavilion Flint in North Wales.

At the heart of the project was the redevelopment of the sports hall. After carrying out site investigations, Alliance discovered that it needed new pile foundations to take the weight of the new project proposals, which consisted of an eight-lane ten pin bowling alley on the ground floor, and a four-lane flat green bowling rink on a new mezzanine level.

Because of the poor soil structure on the site, Alliance contractor ISG used a mini continuous flight auger piling system to construct new foundations. Although this method comes at a higher cost, it meant minimum vibration and noise for the existing, occupied leisure centre, including the adjacent swimming pool facility. Choosing this building route meant The Pavilion was able to stay open for the entire 28-week build period, and therefore maintain its usual revenue stream.

Other facilities at the leisure centre include a fitness suite, a 25-metre swimming pool and children’s pool, café and licensed bar, and multi-activity studios for fitness and dance classes – along with a new pirate-themed children’s soft play area, which was added as part of the redevelopment project.

Follow the series

1. Scoping / Investigation
2. Conceptualisation
3. Viability assessment & full feasibility
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)

Sign up here to get HCM's weekly ezine and every issue of HCM magazine free on digital.
The choice of construction method enabled The Pavilion to stay open during the build
The choice of construction method enabled The Pavilion to stay open during the build
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
https://www.leisureopportunities.co.uk/images/HCM2014_alliance.gif
Part four of a nine-part series detailing Alliance Leisure's process for creating successful public leisure facilities - For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost
International construction services company ISG – Alliance Leisure contractor ,leisure development, rigorous site investigations, project cost, Alliance Leisure,
HCM magazine
HCM People

Dr Jonathan Leary

Founder, Remedy Place
It was as though the whole world woke up at the same time
HCM magazine
Basic-Fit – which has been scaling rapidly across Europe –  is considering franchising to ramp up growth further afield
HCM magazine
New research has found BMI to be a highly inaccurate measure of childhood obesity, leading current thinking and policy based on it into question
HCM magazine
Imposter syndrome about a promotion taught the CEO of SATS that behaving authentically is the most important part of leadership. He talks to Kath Hudson
HCM magazine
Will Orr has been talking to HCM about the company’s new strategy for 2024, as Kath Hudson reports
HCM promotional features
Sponsored
The partnership between PureGym and Belfast-based supplier BLK BOX is transforming the gym floor
HCM promotional features
Sponsored
Francesca Cooper-Boden says health assessment services can boost health club retention
HCM promotional features
Sponsored
D2F had updated its brand styling to keep pace with business growth. MD, John Lofting and operations director, Matt Aynsley, explain the rationale
HCM promotional features
Sponsored
GymNation is pioneering the future of fitness with software specialist Perfect Gym providing a scalable tech platform to power and sustain its growth
HCM promotional features
Sponsored
Epassi, a provider of workplace wellness benefits, is creating a fitter and more productive workforce, one membership at a time 
HCM promotional features
Sponsored
Nuffield Health has worked with ServiceSport UK for more than ten years, ensuring the equipment in its clubs is commercially optimised
HCM promotional features
Sponsored
The New Keiser M3i Studio Bike brings ride data to life to engage and delight members
HCM promotional features
Sponsored
Operators, prepare to revolutionise the way members connect with personal trainers in your club, with the ground-breaking Brawn platform.
HCM promotional features
Sponsored
University of Sheffield Sport has opened the doors of its flagship Goodwin Sports Centre following a major refurbishment
HCM promotional features
Latest News
Norwegian health club operator, Treningshelse Holding, which owns the Aktiv365 and Family Sports Club fitness ...
Latest News
The HCM team were busy at the recent FIBO Global Fitness event in Cologne, Germany, ...
Latest News
Atlanta-based boutique fitness software company, Xplor Mariana Tek, has kicked off a push for international ...
Latest News
The Global Wellness Institute (GWI) has released new data on the US’ wellness economy, valuing ...
Latest News
The fitness sector’s pivot to active wellbeing is being discussed in a new weekly podcast, ...
Latest News
Planet Fitness has a new CEO – Colleen Keating. She will take up the position ...
Latest News
UK Active has announced details of its annual health and fitness industry awards ceremony, which ...
Latest News
Social enterprise, Places Leisure, which is part of the Places for People Group, has appointed ...
Featured supplier news
Featured supplier news: Panatta to showcase innovation at major fitness and bodybuilding events in 2024
Panatta will consolidate its global presence throughout 2024 by attending a host of major industry events around the globe.
Featured supplier news
Featured supplier news: Webinar: Building a new energy future for the leisure sector
As one of the most energy-intensive industries in the UK, leisure facilities face a critical challenge in balancing net zero goals, funding and increased costs.
Company profiles
Company profile: TechnoAlpin
TechnoAlpin is the world leader for snowmaking systems. Our product portfolio includes all different types ...
Company profiles
Company profile: Les Mills UK
For over 50 years Les Mills has been leading the way in fitness to inspire ...
Supplier Showcase
Supplier showcase - Jon Williams
Catalogue Gallery
Click on a catalogue to view it online
Featured press releases
Power Plate UK press release: Power plate + red light therapy: life-changing ‘biostacking’
“We combine Power Plate and red light therapy in all our small group classes,” says Natt Summers, founder and owner of Accomplish Fitness in Hungerford, Berkshire.
Featured press releases
Zoom Media press release: Zoom Media expands partnership with Fitness4less
Zoom Media, the UK's leading provider of health and fitness digital media, has announced a new contract with Fitness4Less to deliver Out of Home advertising across its estate.
Directory
Lockers
Fitlockers: Lockers
Snowroom
TechnoAlpin SpA: Snowroom
salt therapy products
Saltability: salt therapy products
Cryotherapy
Art of Cryo: Cryotherapy
Spa software
SpaBooker: Spa software
Flooring
Total Vibration Solutions / TVS Sports Surfaces: Flooring
Property & Tenders
Loughton, IG10
Knight Frank
Property & Tenders
Grantham, Leicestershire
Belvoir Castle
Property & Tenders
Diary dates
22-24 Apr 2024
Galgorm Resort, York,
Diary dates
10-12 May 2024
China Import & Export Fair Complex, Guangzhou, China
Diary dates
23-24 May 2024
Large Hall of the Chamber of Commerce (Erbprinzenpalais), Wiesbaden, Germany
Diary dates
30 May - 02 Jun 2024
Rimini Exhibition Center, Rimini, Italy
Diary dates
08-08 Jun 2024
Worldwide, Various,
Diary dates
11-13 Jun 2024
Raffles City Convention Centre, Singapore, Singapore
Diary dates
12-13 Jun 2024
ExCeL London, London, United Kingdom
Diary dates
03-05 Sep 2024
IMPACT Exhibition Center, Bangkok, Thailand
Diary dates
19-19 Sep 2024
The Salil Hotel Riverside - Bangkok, Bangkok 10120, Thailand
Diary dates
01-04 Oct 2024
REVĪVŌ Wellness Resort Nusa Dua Bali, Kabupaten Badung, Indonesia
Diary dates
22-25 Oct 2024
Messe Stuttgart, Germany
Diary dates
24-24 Oct 2024
QEII Conference Centre, London, United Kingdom
Diary dates
04-07 Nov 2024
In person, St Andrews, United Kingdom
Diary dates

features

Promotional Feature: Site investigation

For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost. Denis O’Brien, senior surveyor from international construction services company ISG – a key Alliance Leisure contractor – explains the basics of the process

Published in Health Club Management 2014 issue 1

For potential leisure projects, how important are the site investigations in the Alliance design and build process?
Site investigations may not be the most exciting part of the process to talk about, but without very detailed and rigorous surveys at this key stage, it’s impossible to come up with a realistic project cost. Alliance Leisure always works to a fixed price contract, so we need to know about every potential pitfall of the proposed development site.

What’s involved?
It depends whether we’re looking at a new build or an extension to an existing facility. There are obviously a lot more unknowns – particularly relating to the ground works – with a site that doesn’t already have a building on it.

We undertake ground investigation surveys, tree surveys, environmental impact surveys, assess the proximity and ease of access to utilities. We also try to look for the potential show-stoppers such as former coal mines or sink holes. Of course, there are always some things you can’t plan for which might significantly delay the start of the project, such as undiscovered munitions or archaeological remains, but in reality these are very rare occurrences.

When it comes to extensions and redevelopments, there’s another whole tier of investigations to carry out before the project can be accurately costed.

The majority of leisure centres we’re now redeveloping date back to the 60s and 70s, so we have to consider the presence of asbestos and the quality of the drains, as well as undertaking structural surveys to see if the existing structure can take the new load.

We also need to check whether the existing services provision is sufficient to supply a larger site, and carry out a dilapidation survey to check structures such as the original roof, which might be nearing the end of its life.

What are the site problems that add most to the budget?
If there are inadequate services, then the need, for example, to build a sub-station could easily add £100,000–£120,000 to the project cost.

With existing leisure centres, it might be that it’s best to knock down a quarter to a third of the existing building in order to properly develop the site.

However, in the case of older buildings, it’s almost always better to plan to replace some elements of the building right at the start, as the payback on this can be relatively quick. For example, we’ll always introduce modern, efficient lighting to any building project we’re working on from top to bottom, as the energy savings this yields over time can enable the leisure centre to recoup the cost of the capital outlay in just a few years.

It’s a false economy to cut elements like this out of the budget just to bring proposed costs down.

How do the site findings feed into the overall process?
On the basis of these investigations, we’re able to carry out a block planning exercise that comes up with the overall size and shape of the development, together with the content and what it will cost (usually within 10–15 per cent of the final fixed cost).

If there are any real show-stoppers at this stage, which is very rare, the client can choose to walk away and just bear the cost of the site investigations.

Sometimes, at this stage, the local authority might want to scale down some elements of the project to make savings.

If they proceed with the plan, the site investigation costs are absorbed into Alliance’s overall development costs. We then go on to commission architects, and draw up a more robust cost plan and a bill of quantities.

CASE STUDY

Jade Jones Pavilion Flint, North Wales

In July 2012, Alliance Leisure completed a £2m extension and refurbishment project at the Jade Jones Pavilion Flint in North Wales.

At the heart of the project was the redevelopment of the sports hall. After carrying out site investigations, Alliance discovered that it needed new pile foundations to take the weight of the new project proposals, which consisted of an eight-lane ten pin bowling alley on the ground floor, and a four-lane flat green bowling rink on a new mezzanine level.

Because of the poor soil structure on the site, Alliance contractor ISG used a mini continuous flight auger piling system to construct new foundations. Although this method comes at a higher cost, it meant minimum vibration and noise for the existing, occupied leisure centre, including the adjacent swimming pool facility. Choosing this building route meant The Pavilion was able to stay open for the entire 28-week build period, and therefore maintain its usual revenue stream.

Other facilities at the leisure centre include a fitness suite, a 25-metre swimming pool and children’s pool, café and licensed bar, and multi-activity studios for fitness and dance classes – along with a new pirate-themed children’s soft play area, which was added as part of the redevelopment project.

Follow the series

1. Scoping / Investigation
2. Conceptualisation
3. Viability assessment & full feasibility
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)

Sign up here to get HCM's weekly ezine and every issue of HCM magazine free on digital.
The choice of construction method enabled The Pavilion to stay open during the build
The choice of construction method enabled The Pavilion to stay open during the build
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a flat green bowling for the senior market
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a fitness suite, as well as a range of new facilities
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a ten pin bowling to appeal to families
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
Something for everyone - Pavilion Flint offers a new pirate-themed kids’ play area
https://www.leisureopportunities.co.uk/images/HCM2014_alliance.gif
Part four of a nine-part series detailing Alliance Leisure's process for creating successful public leisure facilities - For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost
International construction services company ISG – Alliance Leisure contractor ,leisure development, rigorous site investigations, project cost, Alliance Leisure,
Latest News
Norwegian health club operator, Treningshelse Holding, which owns the Aktiv365 and Family Sports Club fitness ...
Latest News
The HCM team were busy at the recent FIBO Global Fitness event in Cologne, Germany, ...
Latest News
Atlanta-based boutique fitness software company, Xplor Mariana Tek, has kicked off a push for international ...
Latest News
The Global Wellness Institute (GWI) has released new data on the US’ wellness economy, valuing ...
Latest News
The fitness sector’s pivot to active wellbeing is being discussed in a new weekly podcast, ...
Latest News
Planet Fitness has a new CEO – Colleen Keating. She will take up the position ...
Latest News
UK Active has announced details of its annual health and fitness industry awards ceremony, which ...
Latest News
Social enterprise, Places Leisure, which is part of the Places for People Group, has appointed ...
Latest News
Basic-Fit has signed up to trial Wellhub across its recently expanded Spanish network, giving access ...
Latest News
Having redefined the model of public-private collaboration in Spain, Go Fit is now expanding into ...
Latest News
Planet Fitness has become the subject of a hate campaign by certain groups of consumers ...
Featured supplier news
Featured supplier news: Panatta to showcase innovation at major fitness and bodybuilding events in 2024
Panatta will consolidate its global presence throughout 2024 by attending a host of major industry events around the globe.
Featured supplier news
Featured supplier news: Webinar: Building a new energy future for the leisure sector
As one of the most energy-intensive industries in the UK, leisure facilities face a critical challenge in balancing net zero goals, funding and increased costs.
Company profiles
Company profile: TechnoAlpin
TechnoAlpin is the world leader for snowmaking systems. Our product portfolio includes all different types ...
Company profiles
Company profile: Les Mills UK
For over 50 years Les Mills has been leading the way in fitness to inspire ...
Supplier Showcase
Supplier showcase - Jon Williams
Catalogue Gallery
Click on a catalogue to view it online
Featured press releases
Power Plate UK press release: Power plate + red light therapy: life-changing ‘biostacking’
“We combine Power Plate and red light therapy in all our small group classes,” says Natt Summers, founder and owner of Accomplish Fitness in Hungerford, Berkshire.
Featured press releases
Zoom Media press release: Zoom Media expands partnership with Fitness4less
Zoom Media, the UK's leading provider of health and fitness digital media, has announced a new contract with Fitness4Less to deliver Out of Home advertising across its estate.
Directory
Lockers
Fitlockers: Lockers
Snowroom
TechnoAlpin SpA: Snowroom
salt therapy products
Saltability: salt therapy products
Cryotherapy
Art of Cryo: Cryotherapy
Spa software
SpaBooker: Spa software
Flooring
Total Vibration Solutions / TVS Sports Surfaces: Flooring
Property & Tenders
Loughton, IG10
Knight Frank
Property & Tenders
Grantham, Leicestershire
Belvoir Castle
Property & Tenders
Diary dates
22-24 Apr 2024
Galgorm Resort, York,
Diary dates
10-12 May 2024
China Import & Export Fair Complex, Guangzhou, China
Diary dates
23-24 May 2024
Large Hall of the Chamber of Commerce (Erbprinzenpalais), Wiesbaden, Germany
Diary dates
30 May - 02 Jun 2024
Rimini Exhibition Center, Rimini, Italy
Diary dates
08-08 Jun 2024
Worldwide, Various,
Diary dates
11-13 Jun 2024
Raffles City Convention Centre, Singapore, Singapore
Diary dates
12-13 Jun 2024
ExCeL London, London, United Kingdom
Diary dates
03-05 Sep 2024
IMPACT Exhibition Center, Bangkok, Thailand
Diary dates
19-19 Sep 2024
The Salil Hotel Riverside - Bangkok, Bangkok 10120, Thailand
Diary dates
01-04 Oct 2024
REVĪVŌ Wellness Resort Nusa Dua Bali, Kabupaten Badung, Indonesia
Diary dates
22-25 Oct 2024
Messe Stuttgart, Germany
Diary dates
24-24 Oct 2024
QEII Conference Centre, London, United Kingdom
Diary dates
04-07 Nov 2024
In person, St Andrews, United Kingdom
Diary dates
Search news, features & products:
Find a supplier:
Elevate
Elevate
Partner sites